Program 9b




















The Army sponsors applicants to complete a local attendance based GED program prior to accession if the applicant doesn't already possess a GED. The training selected is based on current training requirements existing at the time of applicant's enlistment.

The applicant must understand, however, that one of the following may occur: training selected may be discontinued before attendance; soldier later may become medically disqualified for training selected, or soldier may fail to receive required security clearance not because of data withheld at the time of enlistment.

If any of these occurs, the soldier will be given the chance to select related training or any other training for which qualified and a training requirement quota exists. An alternate selection will be honored.

The soldier will be required to complete the term of service for which enlisted. If the solider does not desire alternate training, the solider may initiate a request for discharge, for unfulfilled enlistment contract. The course length for training is not guaranteed and that the Army may change the course length or numeric designation of a MOS. Enlistment remains valid provided that the MOS does not change content substantially.

This program does not guarantee, imply or promise any assignment upon completion of AIT job school. Further, no guarantee that the soldier will or will not be assigned to an overseas location is made. Recruiters and guidance counselors cannot make speculations or verbal commitments with regard to any provisions of this program. If relieved from training for academic deficiency, disciplinary reasons, or failure to receive required security clearance because of information withheld by the applicant at the time of enlistment, then the soldier will be assigned, according to the needs of the Army, and required to complete the term of service for which enlisted.

This program may be combined with an incentive program such as enlistment bonus or Army College Fund if the applicant meets the requirements of the incentive program and then enlists for a MOS under such program.

Relief from school course for academic deficiency, disciplinary reasons, or failure to obtain the required security clearance is a basis for reassignment under needs of the Army. The soldier will be required to complete his or her term of service for which enlisted.

The Army makes every effort to use language-qualified personnel. Language school graduates may be assigned duties in an appropriate country or area, or be given training in another MOS under needs of the Army before first duty assignment. For persons who possess proficiency in the language for which enlisting, the course length may be reduced by the authority of the Director, Defense Language Institute.

The soldier will be administered the ECLT upon completion of training. The resulting scores from the ASVAB retest will become the scores of record from which qualifications for training and enlistment programs will be determined.

Information Derived From Army Regulation Actively scan device characteristics for identification. Use precise geolocation data. Select personalised content. Create a personalised content profile. This provides superior sub-clutter visibility. Above decks, the radar uses a mechanically rotating, electronically stabilized antenna.

The lightweight 1, lbs. The processor cabinet performs all logical, signal processing, tracking and interface functions. The auxiliary antenna is for the purpose of electronic counter-countermeasures. The output of each receiver is converted to digital baseband I-Q data for Doppler processing in the processor cabinet. The radar set control provides remote control and monitoring of radar operation in the ships Combat Information Center.

The remaining funding was used to develop concepts for a low cost, more conventional reflector type rotating antenna, using signal processing techniques and functional designs developed under exploratory development block programs at the Naval Research Laboratory NRL.

This plan was to reduce the delivery time to the ship by approximately 12 months.



0コメント

  • 1000 / 1000